An open kitchen on Maple Street
- Town
- Cedar Falls
- Finished
- 2026
- Length
- 10 weeks
- Budget range
- $85,000 to $95,000
A closed-off 1962 galley kitchen opened to the dining room with a flush beam, an island with seating for four and a pantry wall.
Before
A narrow galley with dark cabinets, a soffit over every wall and one window over the sink.
After
The wall to the dining room gone, a flush LVL beam in the ceiling, white oak cabinets and a nine-foot island.
What the job took
4 items
- Removed a load-bearing wall and set a flush beam on new posts down to the footing
- Rerouted the furnace supply that ran through the old soffit
- New 200-amp panel to carry an induction range
- Templated quartz after the cabinets were set, so every seam lines up
They told us the beam would take two days and it took two days. Every date held after that, too.